Project Description:  BDCP is a joint state-federal Habitat Conservation Plan/Natural Communities Conservation Plan being developed by the major water contractors that draw water from the Sacramento-San Joaquin River Delta to address long-term resource protection measures associated with water supply diversions. Dr. Siegel sat on its Habitat Technical Team and Habitat and Operations Technical Team as the CALFED representative to assist with formulation of ecosystem restoration strategies. Dr. Siegel also sat on the Conservation Measures Technical Evaluation Team and Conservation Measures Technical Synthesis Team. 

 


Project Duration

2007 - 2010

Client

CALFED Ecosystem Restoration Program

State Water Contractors

Essex Partnership


 

 
 
 
 
Wetlands and Water Resources, Inc. - 818 Fifth Avenue, Suite 208 - San Rafael, CA 94901 - tel 415.457.0250 - fax 415.457.0260 - info@swampthing.org
Copyright © Wetlands and Water Resources, Inc. All Rights Reserved.