View/Download Project Reports, Maps and GIS Data

Integrated Regional Wetlands Monitoring

Wetland and Water Resources' Dr. Stuart Siegel is the Lead Principal Investigator and WWR is part of the Physical Processes and Landscape Ecology teams for the CALFED Science Program-funded Integrated Regional Wetland Monitoring (IRWM) Pilot Project. Begun in fall 2003, this wetland science project will collect monitoring data at four restored and two natural tidal wetlands, stretching from the Petaluma River east to the west Delta (see Site Locations Vicinity Map). IRWM will use these data to evaluate the role of tidal marsh restoration in affecting ecosystem processes at various spatial and temporal scales. IRWM will also be helping to develop field and analytical protocols for monitoring tidal marsh restoration projects. To learn more about IRWM, visit the project web site, www.irwm.org, maintained by the San Francisco Estuary Institute, one of the project partners.

South Bay Salt Pond Restoration Feasibility Analysis (Viewable/downloadable PDF files)


Maps and Notes Report Appendices
High Resolution Maps
(for high-speed connections)
Full Report in One File
(27,300kb)
Appendix A
(975kb)
Lower Resolution Maps
(for slow-speed connections)
Front Cover
(914kb)
Appendix B
(4,030kb)
BCDC Bay Plan (Map 4 Notes)
(may require right-clicking to download)
Part I
(428kb)
Appendix C
(1,960kb)
  Part II
(1,804kb)
Appendix D
(668kb)
  Part III
(6,771kb)
Appendix E
(509kb)
  Part IV
(187kb)
Appendix F
(2,780kb)
Part V
(187kb)
  Map Atlas
(4,400kb)

(low resolution; see map links at left for higher resolution)
Appendix G
(970kb)
 
Back Cover
(202kb)


Click to Request hard copy of Salt Pond Report


Download Free Acrobat PDF Reader (Note: Depending on browser, user may need to right-click PDF to download)

North Bay Wetland Project Mapping

View Map - High Resolution
(for high-speed connections)
View Map - Lower Resolution
(for slow-speed connections)
Download 11x17" TIFF Map
(PC format, 1,804kb, zipped)
View or Download Data Table
(may require right-clicking to download)
Download 34x44" JPEG Map
(PC format, 7,419kb, zipped)
Download All GIS Project Files
(PC format, 19,269kb, zipped)

South and Central Bay Wetland Project Mapping

View Map - High Resolution
(for high-speed connections)
View Map - Lower Resolution
(for slow-speed connections)
Download 34x44" JPEG Map
(PC format, 4,931kb, zipped)
View or Download Data Table
(may require right-clicking to download)

Download GIS Shapefile
(PC format, 165kb, zipped)

[Return to Top]

Wetland Restoration Monitoring

Martin Luther King, Jr. Shoreline Wetland Restoration Project, Oakland, California

Monitoring Report for Year 2001 Monitoring Report for Year 2002
Full Report Figure 12
Text Figure 14
Tables Appendices
Figures 1-9 Appendices Figures  
Download 5-Year Summary Report : Full Report (11.6mb)

Download Year 8 MLK Monitoring Report

Oro Loma Marsh Restoration Project, Hayward, California

 


Petaluma River Tidal Marsh Wetland Restoration Project, Sonoma County, California


Monitoring Report #2
August, 2003

(Full Report, 35.2mb)